
Power on.
Get a delivery dateNo one should wait five years for power.
The grid is booked, and so are the big turbines. Data centers feel it first, but anything new and large is in the same line. We build our own engines and bring them to your site on a flatbed: 200–500 megawatts in 2027, across all sites.§
Site planner
Plan your site.
Pick a place, how much power, and when.

Never go dark. Never overpay.
Every business wants two things from power: it’s always there, and it costs as little as possible. That won’t change.
Solar power costs 90% less than it did in 2010, and batteries 93% less.† So sun, wind, and batteries are now the cheapest way to cover most of your hours. They can’t promise all of them. The smart move is a blend, with one source that can carry the whole load when the others fall short. That source is what we build.
The last hours cost the most.
Each dot is one hour in the dark, per year. Prices are for sun plus batteries in China’s 2024 projects. Source: IRENA.†
Powered 90% of the year$30 per MWh
876hours dark
Powered 99%$46 per MWh
88hours dark
Powered 99.9%The last 1% costs at least 3 times the 4% before it†
9hours dark
Powered 99.99%What data centers need
53minutes dark
Mix planner
Cheap most hours. Certain every hour.
Use the cheap power whenever it’s there. Our engines cover the hours it isn’t. Switch sources on and off and pick a week to blend your own mix.
Get a delivery date for your site.
Send us your plan. We’ll reply with a delivery date and what we need from you.
Or write to power@